METHODOLOGY TO MEASURE PROBABILISTIC MAINTENANCE APPLIED TO ELECTRIC GENERATORS GROUPS, PROPOSED INDICATOR TO EVALUATE LOGISTICS DELAYS, ADMINISTRATIVE. (2018). Perfiles, 2(20), 47-55. https://doi.org/10.47187/perf.v2i20.33